Michel Gamache
BackPublications
Cahiers du GERAD
This paper addresses the difficulties mining companies face in planning their digital transformation. Based on the literature on project portfolio manageme...
BibTeX reference
This paper addresses the Integrated Electrical Drill Rig Dispatching and Drilling Coordination Problem (IDRDCP) in open-pit mining operations, combining mach...
BibTeX referenceScheduling of drilling machines in open-pit mines: Stochastic and non-probabilistic CP approaches
This paper addresses the scheduling of electrical drilling machines in open-pit mines, proposing three constraint programming formulations to account for unc...
BibTeX referenceCoordination of electrical drilling machines in open-pit mines: A constraint programming approach
This article addresses the efficient coordination of multiple electrical drill rigs in open-pit mines, considering unique constraints such as continuous powe...
BibTeX referenceShort-term underground mine planning with uncertain activity durations using constraint programming
The short-term scheduling of activities in underground mines is an important step in mining operations. This procedure is a challenging optimization problem ...
BibTeX reference
A new linear model is presented herein to optimize strategic production scheduling of an open pit mine with multiple processing streams while accounting for...
BibTeX referenceTraining image free high-order stochastic simulation based on aggregated kernel statistics
A training-image free, high-order sequential simulation method is proposed herein, which is based on the efficient inference of high-order spatial statistics...
BibTeX reference
In the area of hydraulic power generation, there is a great deal of interest in two interdependent domains: operation and maintenance. This interdependence...
BibTeX reference
The open-pit mine production scheduling problem aims to optimize the net present value of a mining asset. Several solution methods have been proposed to find...
BibTeX referenceShort- and medium-term optimization of underground mine planning using constraints programming
For the past few years, the mining industry has seen a lot of operational changes. Digitalization and automation of many processes have paved the way for an ...
BibTeX referenceA new computational model of high-order stochastic simulation based on spatial Legendre moments
Multiple-point simulations have been introduced over the past decade to overcome the limitations of second-order stochastic simulations in dealing with geolo...
BibTeX reference
Over the last decade, geological uncertainty, its effects on long-term mine planning and methods for related risk management have been studied. However, th...
BibTeX reference
A new solution approach is developed herein to address the topic of multi-product open-pit mine production scheduling with multi-element uncertainty. The m...
BibTeX reference
This article describes a new model aiming at optimizing short- and medium-term underground mine scheduling. The complexity of the problem to solve and the fr...
BibTeX reference
Management and storage of waste and tailings are critical concerns in open pit mining, especially when the available space is limited but also to reduce the ...
BibTeX reference
Long-term open pit mine scheduling is generally assessed with a mixed integer programming (MIP) formulation which can be solved with different operations res...
BibTeX reference
Most papers on digital advertising focus on the point of view of Internet companies such as Google and Microsoft, and were written by people working for thos...
BibTeX reference
Scheduling activities in an underground mine is a very complex task. This paper presents an optimization model for short-term planning that takes into consid...
BibTeX reference
Airline companies are subject to a considerable amount of disruptions during their operations. It is vital for many industries including the airline industry...
BibTeX referenceUnderground long-term mine production scheduling with integrated geological risk management
A stochastic integer-programming (SIP) model is presented to optimize long-term scheduling of underground mine operations while considering geological uncert...
BibTeX reference
This paper deals with the resource constrained project scheduling problem, which consists of scheduling a set of activities with minimal duration that are su...
BibTeX reference
This paper presents a structured approach to model logical constraints (expressions that contain propositions and logical operators) in a linear program usin...
BibTeX reference
A new algorithm for the optimal stope design problem is proposed. It is based on a previous methodology developed by Bai et al. (2013a) where a cylindrical ...
BibTeX reference
The dust suppression of hauling roads in open-pit mines is done by periodically spraying water from a water truck. The objective of this article is to presen...
BibTeX reference
This article describes the problem in which the edges of a network represent customers, and a quantity of material is delivered to them so that each one achi...
BibTeX reference
In this paper, we present a mixed integer programming model for solving the long-term planning problem of an underground mine. This model establishes the seq...
BibTeX reference
The purpose of this paper is to study the periodic arc routing problem when the arcs of a network behave as customers, and sufficient material is delivered s...
BibTeX reference
In this paper, we propose a generic model based on linear programming that allows building an optimal production plan for a work shift in an open-pit mine. T...
BibTeX reference
Cet article propose une nouvelle architecture générique pour l'implantation d'un système intelligent de contrôle en temps réel basé sur la simulation dans de...
BibTeX referenceEfficient Simulation Model for Real-Time Fleet Management Problems in Internal Transport Systems
This paper presents an efficient approach for realistic modelling of internal transport systems. The weakness of the former methods in tracking the traffic w...
BibTeX reference
This paper presents a new generic architecture for the implementation of an intelligent simulation-based real-time control in large-scale discrete-events sys...
BibTeX reference
Cet article vise l'analyse du type de modélisation des problèmes tests utilisés par les chercheurs pour valider leurs stratégies de pilotage des systèmes d...
BibTeX reference
In this paper, we consider scheduling problems on a single machine in a sequence dependent setup environment. We introduce for these problems several integer...
BibTeX reference
We consider a crew scheduling problem with preferential bidding in the airline industry. We propose a new methodology based on a graph coloring model and a ...
BibTeX reference
In this paper, a solution approach based on the column generation technique is pre- sented for solving a time-indexed formulation of the total weighted tard...
BibTeX reference
This paper introduces the first exact approach for constructing aircrew member personalized monthly work schedules when a preferential bidding system (PBS) ...
BibTeX reference
This paper presents an enumeration algorithm based on dynamic programming for optimally solving the fleet management problem in underground mines. This probl...
BibTeX reference
The fleet management problem discussed in this paper consists in assigning the best routes to a set of vehicles in an underground mine haulage network. The h...
BibTeX reference
This paper presents two solution approaches for taking into account the displacement mode (forward or in reverse) of vehicles during the solution of the shor...
BibTeX reference
This paper presents a new branching strategy that is applied on the cost of a subproblem during the solution of a large-scale linear program by a column gene...
BibTeX reference
This paper describes a real-time fleet-management system for an underground mine. Dispatching, routing, and scheduling are handled simultaneously, taking...
BibTeX referenceA Solution Approach for a Real-Time Fleet Management System: An Application to Underground Mining
This paper presents a solution approach for routing a fleet of automated vehicles on haulage networks having one-lane bidirectional road segments. The solu...
BibTeX reference
This paper deals with dispatching systems in open-pit mines. It illustrates the different strategies that exist for solving the dispatching problem and ana...
BibTeX reference
The operating schedule problem in open-pit mine can be associated with the problem of maximal closure on a graph. In the literature, the Lagrangian relaxati...
BibTeX reference
Cet article décrit un problème d'horaires mensuels personnalisés pour les membres d'équipage (pilotes et officiers) en transport aérien. Ce problème consist...
BibTeX reference
This article describes a method for solving the crew rostering problem in air transportation. This problem consists of constructing personalized schedules ...
BibTeX reference
This paper describes the Preferential Bidding Problem solved in the airline industry to construct personalized monthly schedules for pilots and officers. T...
BibTeX reference
We propose a common solution approach for different crew scheduling problems arising at the planning and operational levels in the airline industry. Specifi...
BibTeX reference
This paper propose a column generation method for optimally solving the rostering problem. Various strategies for accelerating the column generation process...
BibTeX reference