G-2021-13
Adaptive simultaneous stochastic optimization of a gold Mmning complex: A case study
and BibTeX reference
An innovative strategic mine planning approach is applied to a multi-mine and multi-process gold mining complex that simultaneously considers feasible capital investment alternatives and capacity management decisions that a mining enterprise may undertake. The simultaneous stochastic optimization framework determines the extraction sequence, stockpiling, processing stream, blending, waste management and capital investment decisions in a single mathematical model. A production schedule branches and adapts to uncertainty based on the likelihood of purchasing a number of feasible investment alternatives that may improve mill throughput, blending or increase the tailings capacity. Additionally, the mining rate is determined simultaneously by selecting the number of trucks and shovels required to maximize the value of the operation. The mining complex contains several sources -- two open-pit gold mines and externally sourced ore material -- stockpiles, waste dumps, tailings and three different processing streams. The simultaneous optimization framework integrates the blending of sulphates, carbonates, and organic carbon at the autoclave for refractory ore while managing acid consumption. The production schedule generated branches over an investment in the autoclave expansion; the first branch undertakes the capacity expansion at the autoclave resulting in a 6.4% increase in NPV, whereas the second branch results in a 27.5% increase in NPV without the investment. The adaptive approach is compared to a base case production schedule generated using a non-branching two-stage stochastic integer program.
Published April 2021 , 20 pages
Research Axes
Research application
Publication
Document
G2113.pdf (2 MB)